Call 081 459 8592
Our work

Jobs off our own sites

Every photograph below is a real installation, photographed on the day. Rooftops, boards, inverters and battery banks.

A full commercial install above the Johannesburg CBD.

Commercial rooftop array

A full commercial install above the Johannesburg CBD.

Panels tied down, cabling run, ready for commissioning.

Same roof, end of day

Panels tied down, cabling run, ready for commissioning.

Inverter and a bank of lithium batteries, all neatly boarded.

Battery wall

Inverter and a bank of lithium batteries, all neatly boarded.

Two inverters and two batteries for a larger household load.

Twin inverter setup

Two inverters and two batteries for a larger household load.

Wall-mounted install with the trunking run straight.

Inverter and batteries

Wall-mounted install with the trunking run straight.

Hybrid inverter and battery on a clean interior wall.

Hybrid inverter

Hybrid inverter and battery on a clean interior wall.

Inverter, battery and isolator laid out to be serviceable.

Tidy finish

Inverter, battery and isolator laid out to be serviceable.

Testing the system before it is handed over.

Commissioning

Testing the system before it is handed over.

Inverter tied into the distribution board.

Board and inverter

Inverter tied into the distribution board.

A row of batteries installed and wired in.

Battery bank

A row of batteries installed and wired in.

The team setting rails and laying panels.

On the roof

The team setting rails and laying panels.

Clamping panels down on a tiled roof.

Panel by panel

Clamping panels down on a tiled roof.

A residential array going down on tile.

Tile roof array

A residential array going down on tile.

Ballasted mounting on a flat roof.

Flat roof mount

Ballasted mounting on a flat roof.

A larger residential run across two roof planes.

Wide array

A larger residential run across two roof planes.

Highveld weather is what makes solar work here.

Under a big sky

Highveld weather is what makes solar work here.

Array installed across a complex roof.

Townhouse complex

Array installed across a complex roof.

Geyser and collector mounted and plumbed.

Solar geyser

Geyser and collector mounted and plumbed.

Tube collector for hot water on a tiled roof.

Evacuated tubes

Tube collector for hot water on a tiled roof.

Breakers, earth leakage and labelling.

Distribution board

Breakers, earth leakage and labelling.

Older switchgear inspected and maintained.

Industrial switchgear

Older switchgear inspected and maintained.

An industrial panel opened up for work.

Control panel

An industrial panel opened up for work.

Wiring out a control panel on site.

Panel build

Wiring out a control panel on site.

Walking the customer through their new system.

Handover

Walking the customer through their new system.

Want your property on this list?

Send through what you need and we will come and look before quoting.